New Memorial Site Visit

The New Memorial Building Committee met for the first time last night at the construction site. The tour was coordinated by Kevin Buckley, the architect for the project.

Kevin showed how the outside walls are constructed using a mock up built by the contractor – CTA Construction.

The classroom spaces at the new school are about 25% larger than the classrooms in the current building.

Natural light is a priority in the new building.  Each classroom has three large windows.

The caferia and gymnasium were the last floors to be poured.  The cement was curing during the site visit. 

You can observe the building’s project using a live cam on the project as a page on the blog.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s